From loading dock to live rack.

Physical build, liquid-cooling integration and structured cabling, handled and recorded end to end.

Rack & Stack Deployment — Enterprise Server and GPU Chassis Installation
WHAT WE DO

Service Scope

Full-lifecycle deployment from verified uncrating through structural installation and handover.

Goods receipt & inventory check against the BOM

Serial number capture, condition inspection, and component verification against design manifests.

Structured copper & fiber cabling, labeled to the port map

Precision length routing, ANSI/TIA-606-B port labeling, and low-loss connector terminations.

Rack positioning, leveling & securing to the floor plan

Millimeter positioning, leveling feet calibration, and heavy-duty structural anchoring.

Cable bundling, dressing & patching at both ends

Velcro harness management, clean horizontal/vertical routing, and unobstructed exhaust airflow.

CDU & liquid-cooling loop integration for high-density racks

Cooling distribution unit manifold coupling, closed-loop pressure testing, and leak-free fluid validation.

As-built documentation on handover

Comprehensive rack elevations, port interconnect matrices, and verified test results.

Rack & Stack Deployment — High-Density Structured Cabling and Port Dressing
OUR APPROACH

How It Works

Every delivery opens with an inventory check — materials counted and matched against the BOM before staging begins. Racks then move from the loading area to the data hall on a motorized tug and ramps built for a fraction of that load. Once positioned, each rack is leveled and secured; on liquid-cooled GPU racks, the CDU and coolant loop are integrated and pressure-tested before power-on. Cabling follows a fixed sequence — label, unroll, bundle, install, patch and dress — and nothing goes live until it's tested and recorded as built.

DELIVERY PROCESS

Delivery Process

01

Inventory Check

Materials counted, unboxed, and matched against the BOM before staging.

02

Position & Secure

Racks safely moved to the data hall, positioned, leveled, and secured.

03

Cooling Integration

CDU and coolant loop integrated and pressure-tested before power-on.

04

Cable & Patch

Cabling sequenced: label, unroll, bundle, install, patch, and dress.

05

Test & Document

Comprehensive continuity verification and as-built handover documentation.