Goods receipt & inventory check against the BOM
Serial number capture, condition inspection, and component verification against design manifests.
Physical build, liquid-cooling integration and structured cabling, handled and recorded end to end.

Full-lifecycle deployment from verified uncrating through structural installation and handover.
Serial number capture, condition inspection, and component verification against design manifests.
Precision length routing, ANSI/TIA-606-B port labeling, and low-loss connector terminations.
Millimeter positioning, leveling feet calibration, and heavy-duty structural anchoring.
Velcro harness management, clean horizontal/vertical routing, and unobstructed exhaust airflow.
Cooling distribution unit manifold coupling, closed-loop pressure testing, and leak-free fluid validation.
Comprehensive rack elevations, port interconnect matrices, and verified test results.

Every delivery opens with an inventory check — materials counted and matched against the BOM before staging begins. Racks then move from the loading area to the data hall on a motorized tug and ramps built for a fraction of that load. Once positioned, each rack is leveled and secured; on liquid-cooled GPU racks, the CDU and coolant loop are integrated and pressure-tested before power-on. Cabling follows a fixed sequence — label, unroll, bundle, install, patch and dress — and nothing goes live until it's tested and recorded as built.
Materials counted, unboxed, and matched against the BOM before staging.
Racks safely moved to the data hall, positioned, leveled, and secured.
CDU and coolant loop integrated and pressure-tested before power-on.
Cabling sequenced: label, unroll, bundle, install, patch, and dress.
Comprehensive continuity verification and as-built handover documentation.