Data Center Migrations

Capabilities Professional Services Data Center Migrations

Move infrastructure without losing the map.

Facility-to-facility relocation, planned around your downtime tolerance, not a fixed script.

WHAT WE DO

Migration plan & cutover risk assessment

Asset re-documentation against the new floor plan

Physical transport, secured and tracked

Cutover testing before go-live

Re-positioning, re-cabling & re-labeling at destination

HOW IT

WORKS

A migration is only as good as what's still connected correctly afterward. We map every rack, cable and dependency before moving day, then agree a cutover model that fits your actual downtime tolerance instead of defaulting to the same approach every time. Hardware moves under our own custody from old site to new — nothing changes hands with a separate carrier partway through. On arrival, positioning, cabling and labeling are rebuilt to the new floor plan, then tested before your team takes it live.

01

Running in Parallel

02

Moving in Stages

03

Single Cutover Window

“Hardware stays in our custody for the whole move — there's no handoff to a separate transport vendor partway through.”

NEXT
Retiring the old site? Continue with Decommissioning & ITAD
View Service →

Relocating infrastructure?

Tell us the timeline and we'll map the cutover with you.

Scope a migration