Move infrastructure without losing the map.
Facility-to-facility relocation, planned around your downtime tolerance, not a fixed script.
WHAT WE DO
Migration plan & cutover risk assessment
Asset re-documentation against the new floor plan
Physical transport, secured and tracked
Cutover testing before go-live
Re-positioning, re-cabling & re-labeling at destination
HOW IT
WORKS
A migration is only as good as what's still connected correctly afterward. We map every rack, cable and dependency before moving day, then agree a cutover model that fits your actual downtime tolerance instead of defaulting to the same approach every time. Hardware moves under our own custody from old site to new — nothing changes hands with a separate carrier partway through. On arrival, positioning, cabling and labeling are rebuilt to the new floor plan, then tested before your team takes it live.
Running in Parallel
Moving in Stages
Single Cutover Window
“Hardware stays in our custody for the whole move — there's no handoff to a separate transport vendor partway through.”
Relocating infrastructure?
Tell us the timeline and we'll map the cutover with you.